Uniformed plumber kneeling beside open chase wall brazing a medical gas joint in a modern clinic corridor while a nurse walks calmly past in the background
ASSE 6010NFPA 99Backflow CertifiedMedical Gas

Zero disruption.
Full compliance.
Every joint.

Medical gas, sterile water, and backflow systems threaded through live operating theaters and neonatal wards — without stopping the floor.

Emergency Line: 1-800-555-1234
Scroll

Every job, documented.
Every cert on file.

Hover or tap any card to flip from assessment photo to completed installation.

Corroded copper medical gas risers with outdated non-compliant fittings photographed during facility assessment
Before2024

Cincinnati, OH

Riverside Regional Medical Center

Non-compliant NFPA 99 risers, 2019 install

Medical gas riser replacement — 4 OR suites

Tap to see result
New medical gas risers installed and tagged with inspection certificates visible in operating suite
AfterNFPA 99 / ASSE 6010
4 ORs

back online in 72 hrs

Cincinnati, OH

Riverside Regional Medical Center

ASSE 6010 certified, tagged & tested

Failed backflow preventer with mineral scale buildup and deteriorated seals photographed during inspection
Before2024

Cleveland, OH

Lakefront Dialysis Center

Failed ASSE 1013 backflow, 3 alarms in 60 days

RO water system & backflow preventer retrofit

Tap to see result
New ASSE 1013 backflow preventer installed and tagged with test certification card attached
AfterASSE 1013 / USC FCCCHR
0 alarms

in 8 months post-install

Cleveland, OH

Lakefront Dialysis Center

Tested & certified, 0 alarms since

Open chase wall framing with rough plumbing stubs before medical gas installation in new ambulatory surgery center
Before2023

Columbus, OH

Mercy Ambulatory Surgery Center

Open chase, 14-week fit-out window

Full medical gas fit-out — new construction

Tap to see result
Completed medical gas zone valve boxes and outlet panels with color coded identification labels in surgical suite
AfterNFPA 99 Chapter 5
11 weeks

rough-in to final cert

Columbus, OH

Mercy Ambulatory Surgery Center

Rough-in to cert in 11 weeks

Cross connection point in clinic plumbing with missing backflow protection identified during emergency assessment
Before2023

Dayton, OH

Advanced Dermatology Group

Cross-connection, city notice issued

Backflow prevention after cross-connection scare

Tap to see result
Newly installed reduced pressure zone assembly with annual test tag and compliance documentation
AfterASSE 1015 / State Lic. OH-P23847
48 hrs

notice to city clearance

Dayton, OH

Advanced Dermatology Group

RPZ installed, city sign-off in 48 hrs

Aging nitrous oxide distribution lines with improper fittings and missing pressure gauges in dental operatory
Before2024

Toledo, OH

Great Lakes Dental Partners

Aging N2O lines, 3 failed pressure checks

Nitrous oxide & compressed air line audit + repair

Tap to see result
New color coded nitrous oxide and compressed air lines with proper zone valve and pressure monitoring installed
AfterNFPA 99 / ADA Guidelines
6 ops

upgraded in one weekend

Toledo, OH

Great Lakes Dental Partners

Pressure-tested, color-coded, certified

Aging boiler room with corroded pipes insulation damage and non compliant pressure relief valve configuration
Before2022

Akron, OH

Summit Health Clinic

Corroded risers, 22% heat loss, 2 PRV failures

Boiler room overhaul & hot water recirculation

Tap to see result
Refurbished boiler room with new insulated piping labeled valves and compliant pressure relief valve configuration
AfterASME / Ohio BBS Lic.
22%

heat loss eliminated

Akron, OH

Summit Health Clinic

New recirculation loop, 0 downtime

Insufficient water supply points for isolette stations in neonatal ward before expansion work
Before2023

Pittsburgh, PA

Neonatal Care Unit — St. Agnes

Insufficient sterile water points for expansion

Sterile water system expansion — 8 isolette stations

Tap to see result
Completed sterile water outlet stations installed at each isolette position in neonatal intensive care unit
AfterNFPA 99 / CMS Conditions
8 stations

zero floor disruption

Pittsburgh, PA

Neonatal Care Unit — St. Agnes

8 stations, zero floor disruption

Single point dental vacuum manifold with insufficient capacity for multi chair oral surgery center
Before2024

Louisville, KY

Eastside Oral Surgery Center

Undersized vacuum, suction failures mid-procedure

Dental vacuum & compressed air manifold

Tap to see result
New centralized dental vacuum and compressed air manifold with redundant pumps and capacity for full surgical center
AfterNFPA 99 / ADA
14 months

zero suction failures

Louisville, KY

Eastside Oral Surgery Center

Redundant manifold, no failures in 14 months

Or call us: 1-800-555-1234

Built for clinical-grade
infrastructure.

Every service backed by certification. Every credential posted, not just claimed.

ASSE 6010 / NFPA 99 Ch. 5

Medical Gas Systems

Oxygen, nitrous oxide, medical air, vacuum, and WAGD systems installed, tested, and certified to NFPA 99 in live clinical environments.

200+

medical gas projects

O₂ ManifoldsZone Valves
ASSE 1013 / USC FCCCHR

Backflow Prevention

ASSE-certified backflow preventer installation, annual testing, and emergency response for cross-connection events — city sign-off handled.

100%

city approval rate

RPZ AssemblyDCVA
ASME / Ohio BBS Lic.

Boiler & Steam Systems

Low and high-pressure boiler installation, repair, and compliance inspections. ASME-coded work with Ohio BBS licensing for healthcare facilities.

18 yr

average facility age served

Low PressureHigh Pressure
Licensed & Insured OH/PA/KY

Emergency Repair

24/7 response to sterile water failures, gas line leaks, and backflow alarms in operating hospitals. 90-minute average response time in our region.

90 min

avg. emergency response

24/7 DispatchLive OR Support
NFPA 99 / CMS Conditions

New Construction Fit-Out

Full rough-in to final certification for ambulatory surgery centers and clinic expansions, coordinated with your GC on immovable handoff dates.

11 wk

avg. ASC rough-in to cert

ASC Fit-OutNICU Expansion
Joint Commission Prep

Compliance Audits

Pre-inspection walkthroughs, NFPA 99 gap analysis, and documentation packages for Joint Commission surveys and CMS conditions of participation.

0

failed Joint Commission surveys

Gap AnalysisDocumentation
Emergency line: 1-800-555-1234

Every certification posted.
Not just claimed.

22+

Years in Clinical Plumbing

Founded 2003

340+

Facilities Served

OH · PA · KY · IN

100%

NFPA 99 Compliance Rate

On every project

90 min

Emergency Response

24/7/365 dispatch

ASSE 6010

Medical Gas Systems Installer

ASSE 6020

Medical Gas Systems Verifier

ASSE 1013

Backflow Preventer Testing

NFPA 99

Health Care Facilities Code

ASME B31.3

Process Piping

Ohio Lic. OH-P23847

State Plumbing License

PA Lic. PA-P88312

State Plumbing License

KY Lic. KY-M44201

State Plumbing License

OSHA 30

Construction Safety

JC Survey Ready

Joint Commission Prep

ASSE 6010 CertifiedNFPA 99 CompliantASSE 1013 BackflowMedical Gas SpecialistsOhio Lic. OH-P23847Joint Commission Ready24/7 Emergency ResponseASME Coded WorkZero Failed SurveysASSE 6020 Verifier340+ FacilitiesLive OR ExperienceASSE 6010 CertifiedNFPA 99 CompliantASSE 1013 BackflowMedical Gas SpecialistsOhio Lic. OH-P23847Joint Commission Ready24/7 Emergency ResponseASME Coded WorkZero Failed SurveysASSE 6020 Verifier340+ FacilitiesLive OR Experience

We walk through your facility.
You keep running yours.

From a single backflow scare to a full OR fit-out, our team arrives certified, works clean, and leaves every joint documented to code.

ASSE 6010NFPA 99ASSE 1013ASMEJC ReadyOH · PA · KY Licensed
Emergency: 1-800-555-1234
Emergency